Description
The HANNAY 1-1/2″ Steel Hub Assembly (Model H5M) features robust steel construction designed for demanding industrial applications. This assembly includes a Schedule 160 riser and precision fitting, engineered to provide reliable performance and durability in hose reel and fluid handling systems. Its heavy-duty steel components ensure long-lasting corrosion resistance and structural integrity under high-pressure conditions.
Key Features:
- Constructed from high-strength steel for enhanced durability
- Includes Schedule 160 riser for superior pressure handling
- Precision-engineered fitting for secure connections
- Compatible with HANNAY hose reels and related assemblies
- Designed for ease of installation and maintenance
Specifications:
- Model: H5M
- Size: 1-1/2″ Steel Hub Assembly
- Riser: Schedule 160
- Material: Steel
- SKU: 99 01.2850
Applications:
- Industrial hose reel assemblies
- Fluid transfer and handling systems
- Oil and gas industry equipment
- Manufacturing and processing plants
- Heavy-duty mechanical and hydraulic systems
Why Choose H5M Steel Hub Assembly:
HANNAY’s H5M Steel Hub Assembly combines trusted brand quality with engineered precision to deliver a component that withstands rigorous industrial environments. Its durable steel construction and Schedule 160 riser ensure reliable performance, making it an essential part for professionals seeking longevity and efficiency in hose reel assemblies.






Reviews
There are no reviews yet.