Description
The GRACO QUANTM Electric Diaphragm Pump is a high-efficiency, electric-operated double diaphragm pump designed for fluid transfer in demanding industrial environments. It features a 1.5″ Tri-Clamp connection, a hygienic stainless steel fluid section, and is engineered for use in food, pharmaceutical, and chemical applications. The pump is intended to replace traditional air-operated diaphragm pumps, offering significant energy savings and improved reliability.
Key Features:
- Electric Double Diaphragm Pump (EODD)
- HE80-0753 (note: exact part number may vary; HE80-1400 and HE80-0273 are closely related models with similar specs)
- 316L Stainless Steel fluid section, FEP-coated aluminum electric drive, 316 Stainless Steel seats, PTFE balls, PTFE Overmold diaphragms, EPDM manifold o-rings
- Up to 300 lpm (liters per minute) for similar models
- Max. working pressure: 7 bar
- Designed for use with a wide range of fluids, including those requiring high sanitation standards
- EN 2.1 material certification; available in Food Grade (FG), High Sanitary (HS), Pharmaceutical (PH), and 3A approved finishes
- Up to 80% reduction in energy consumption compared to pneumatic pumps
- Quiet operation (as low as 40 dBA)
- Compact and efficient electric drive, comparable footprint to pneumatic pumps
- Smart pump control for accurate flow set points and built-in I/O
- AutoPrime feature for easy startup
- Easy installation and maintenance
- Handles solids and abrasive materials
Applications:
Ideal for fluid transfer in food, pharmaceutical, chemical, and industrial applications requiring high sanitation, reliability, and energy efficiency.
Installation Notes:
- Using genuine GRACO parts ensures optimal performance, reliability, and compliance with industry standards.
- Ensure proper alignment and secure mounting of the pump
- Connect electrical supply according to specifications (e.g., 380-480 VAC 3Ph for HE80-1400, or 230V 50Hz for some models)
- Use appropriate Tri-Clamp fittings for sanitary connections
- Follow manufacturer guidelines for initial priming and startup
- Regularly inspect and maintain diaphragms, seals, and electrical connections
- Consult the equipment manual for detailed installation and maintenance procedures
- Use only recommended spare parts and lubricants
- Monitor pump performance and address any unusual noise or vibration promptly






Reviews
There are no reviews yet.